Grow your YouTube channel like a PRO with a free tool
Get Free YouTube Subscribers, Views and Likes

Bokor field development - BOCCP-A topside float-over utilizing dynamic positioning

Follow
Boskalis

Surgical precision, that’s how the floatover installation of the 11,500 ton Bokor CPPA platform topside offshore Sarawak, Malaysia can be characterized. For this incredibly precise operation our semisubmersible heavy transport vessel Forte was fitted out with a dynamic positioning (DP2) system that automatically controlled its position and course during the installation activities. With very limited space to maneuver during the floatover, true craftsmanship was displayed by the project team and crew onboard the Forte.

#boskalis #creatingnewhorizons #floatoverinstallation #surgicalprecision #Forte #StaySafe

posted by cordoantad3