Free YouTube views likes and subscribers? Easily!
Get Free YouTube Subscribers, Views and Likes

Egham Level Crossing

Follow
SteveDD1

Saturday June 29 2024 at 5.53 and 6.08. The 5.45 Ascot to London Waterloo (6.55) train and, from the other side, the 5.40 Waterloo to Reading (6.47) service which started 14 minutes late but arrived on time. Came here in 2011:    • Egham Level Crossing   and in 2017:    • Egham Level Crossing   and filmed both sides each time. Earlier this year the local MP said there were huge delays at this crossing. A spokesman for Network Rail said that longer waiting times have been reported since "our £375m upgrade of the signalling system across parts of Surrey, SW London and Berkshire. How, one wonders, can it possibly have cost that much? Is that £2m a signal? In 2000 a gang hijacked a van waiting at this level crossing, turned it around and drove off with it.

posted by pojedzonenz