Get free YouTube views, likes and subscribers
Get Free YouTube Subscribers, Views and Likes

Episode 13: How To Install An Entry Door In A New Rental Duplex

Follow
Building Boys

In this video we are installing the entry doors to our passive income zero entry rental property.

https://thebuildingboys.com/'>https://thebuildingboys.com/'>https://thebuildingboys.com/'>https://thebuildingboys.com/'>https://thebuildingboys.com/'>https://thebuildingboys.com/'>https://thebuildingboys.com/'>https://thebuildingboys.com/

Being a full time chiropractor, I only have 1 day a week to work on this project. But that is more then enough. Our time line is one year and we ALREADY have renters paying deposits! Follow our approach and do this yourself with our helpful videos and our fully inclusive blueprints!

If you like what you see and want to replicate this whole process please “Like, Subscribe” to our channel and check out our website where we offer EVERYTHING you need to build this exact duplex!

https://thebuildingboys.com/'>https://thebuildingboys.com/'>https://thebuildingboys.com/'>https://thebuildingboys.com/'>https://thebuildingboys.com/'>https://thebuildingboys.com/'>https://thebuildingboys.com/'>https://thebuildingboys.com/

Building Boys Duplex Blueprints Includes:
*Digital and Hard Copies
*Kitchen/Vanity Cabinet Schematics
*Floor Plan Blueprints (includes foundation)
*Elevation Images
*3D Images
*Electrical Material List
*Truss Schematics
*Plumbing/HVAC Material List

https://thebuildingboys.com/'>https://thebuildingboys.com/'>https://thebuildingboys.com/'>https://thebuildingboys.com/'>https://thebuildingboys.com/'>https://thebuildingboys.com/'>https://thebuildingboys.com/'>https://thebuildingboys.com/

Running Total:

$10,750Land
$2,070.00Dirt work
$17,660.00Concrete (footings, sidewalls)
$22,870.00 Concrete Floor Poured
$15,000 (RoughIn Sewer/Water Lines)
$10,000 In Floor Heat
$6,342.44 Lumber (For Framing)
$9,000 HVAC/Plumbing Equipment Purchase (AC Units, boiler…)
$8,821.93 Trusses Hung, sheathed, synthetic felt, rain and ice (Labor)
$16,302.27 (Trusses, Shingles, OSB sheathing (sidewalls).
$26,212.11 (Roof Sheathing, Windows, Entry Doors, Garage Doors, Tyvek, Rebar For Driveway)

Total
$145,913


https://thebuildingboys.com/'>https://thebuildingboys.com/'>https://thebuildingboys.com/'>https://thebuildingboys.com/'>https://thebuildingboys.com/'>https://thebuildingboys.com/'>https://thebuildingboys.com/'>https://thebuildingboys.com/

posted by ladjarski0p