Grow your YouTube channel like a PRO with a free tool
Get Free YouTube Subscribers, Views and Likes

Here's how billions of dollars in cost overruns came to define Boston's Big Dig

Follow
GBH News

As they dug the tunnel below Boston's elevated Central Artery, an army of contractors encountered the subterranean infrastructure that powered the city gas, thermal, electric, telephone and sewer lines. It slowed down work and drove up costs. But for six years the overall cost of the Big Dig never changed. This episode unravels the Big Dig's accounting and explores why cost overruns came to define the project.

This is the sixth in a ninepart podcast series about history and politics of the Big Dig – one of the most notoriously troubled infrastructure projects in American history. It was created as an audio experience. This presentation includes archival images.

Episode 1:    • The Big Dig began with activists who ...  
Episode 2:    • How two competing tunnel projects bec...  
Episode 3:    • How Boston's Big Dig survived Preside...  
Episode 4:    • Here's why Boston's beloved Zakim Bri...  
Episode 5:    • It took a feat of engineering and a p...  
Episode 7:    • How a power struggle over a Massachus...  
Episode 8:    • Boston's Big Dig tunnels were nearly ...  
Episode 9:    • The Big Dig transformed Boston, so wh...  

You can find more about The Big Dig podcast at https://www.wgbh.org/podcasts/thebig...

GBH News is a premier source for indepth local news and original story telling based in Boston, Massachusetts.

Subscribe to the GBH YouTube channel: https://www.youtube.com/c/gbhnews?sub...
Follow GBH News on Instagram:   / gbhnews  
Like GBH News on Facebook:   / gbhnews  
Follow GBH News on Twitter:   / gbhnews  

We can’t do it without you. Support our awardwinning community journalism by donating today: https://bit.ly/SupportGBHNews

posted by Bemasatheh2