This is from a recent project of ours where we had stockpiled the as dug soil on site.
We had dug the footing for the building and removed the over site for the patio base build up.
Now it is time to grade in the paving level and along the building with the lawn and then seed.
The larger waste lumps are tipped and tracked into the base and then the fines are screened over the top.
http://www.reachitmoveitcrushit.com/i...