Elevator design / Principles of Engineering / Activity 3.1.6 Final VEX build and coding / Owen O'Rafferty and Ancel Varner / May 9th 2024
Very proud of our design. It took about 2 weeks to build and we had many different challenges, like it not detecting floors, and going up to high or too low to the point where the rope snapped (4 times) but it the end it worked flawlessly.
Final project for POE 2024