A little secret to rock your YouTube subscribers
Get Free YouTube Subscribers, Views and Likes

SDI - FTT 114 - Week 4 Assignment Two (Kydex Holster Build Part 2)

Follow
Tradesman Firearms

Finish and polish the design of your Kydex project. You will finalize the locating and riveting process, attach at least one belt loop, and finalize any aesthetics (stenciling/painting) on your build this week. Submit a minimum of four photographs of the following:

1. Locating, punching, and riveting your holes

2. Attaching one or more belt loop(s) to the finished Kydex holster, magazine pouch, or sheath.

3. Sanding, polishing, and finalizing the project.

4. Any aesthetics such as stenciling, painting, and/or engraving, if applicable.

5. Include at least one picture of the retention device being worn on a strap or belt, as appropriate.

You must include evidence of all required steps to receive full credit.

Music from #Uppbeat (free for Creators!):
https://uppbeat.io/t/matrika/smackthat
License code: M47GNHU2WEZP2IOJ

posted by encensersb