The tutorial will shows how to translate a hydrogeological problem formulation into a conceptual model description and how to build and run a steadystate groundwater model using PMWIN 8.
Step
1. Conceptual model choice
2. Create a new PMWIN model
3. Generate the model grid
4. Assign the type of layers
5. Assign cell status
6. Specify the elevation of the top and bottom of the model layers
7. Specify the initial and prescribed hydraulic head
8. Specify hydraulic conductivity
9. Specify the effective porosity
10. Specify the recharge rate
11. Specify the pumping well and the pumping rate
12. Perform the flow simulation
13. generate contour maps of the calculated heads
14. Calculate subregional water budgets
Note: this tutorial is part of Groundwater Modelling course to Undergraduate student of Water Resources and Irrigation Engineering. I used resource from manual of the software