Get free YouTube views, likes and subscribers
Get Free YouTube Subscribers, Views and Likes

Transformer load calculation! 1000 kva transformer full load current calculation

Follow
SN TECHNICAL

Transformer full load current calculation

In this video we explain 1000kva transformer full load current calculation which is mostly ask in interview

For this we first need to know kva formula which is

Kva=√3vi/1000

By using this formula you can easily calculate full load current of 3 phase transformer

But we can't connect load of full load of any component
So we can only connect 75% to 80% of full load current

We explain all concept very easily for more information learning about this topic just watch and learn


Siemens drive parameter setting and connection
   • SIEMENS SINAMICS V20 DRIVE WIRING CON...  

How to calculate kwh or electrical bill calculation
   • WHAT IS KWH(UNIT)? HOW TO CALCULATE K...  

Cable testing with multimeter
   • HOW TO TEST CABLE WITH DIGITAL MULTIM...  


Reverse forward starter power wiring connection
   • REVERSE FORWARD STARTER POWER WIRING ...  


Manual reverse forward starter with limit switch
   • How to make Reverse forward starter (...  

Automatic reverse forward starter
   • Star Delta starter power wiring & con...  

Automatic reverse forward motor starter connection
   • Automatic reverse forward starter con...  


3 phase rccb test on single phase supply practical
   • 3 PHASE RCCB मे SINGLE PHASE SUPPLY द...  


3 phase ammeter connection with selector switch
   • 3 PHASE AMMETER CONNECTION WITH SELEC...  


8 pin relay testing with multimeter
   • 8 PIN RELAY TESTING WITH MULTIMETER  


How to check ceiling fan common start run with multimeter
   • 3 WIRE CEILING FAN COMMON, START, RUN...  

How to make dol starter with relay
   • How to make dol starter with Relay  


How to check ceiling fan common start run with series lamp
   • Video  


ammeter connection with current transformer
   • 3 PHASE AMMETER CONNECTION AND INSTAL...  

Cooler motor testing with series test lamp
   • COOLER MOTOR TESTING WITH SERIES TEST...  

Street light timer setting
   • STREET LIGHT TIMER SETTING & CONNECTI...  

Air compressure power & control wiring practically
   • AIR COMPRESSURE  के STARTER की COTROL...  


3 phase cable testing with megger
   • HOW TO CHECK CABLE INSULATION WITH ME...  




3 phase motor test with megger
   • Induction motor test (megger)  

Dol starter control from different points
   • MOTOR CONTROL FROM DIFFERENT PLACES C...  

How to make reverse forward motor starter
   • How to make  Reverse forward starter?  

Manual reverse forward starter with limit switch
   • How to make Reverse forward starter (...  

Automatic reverse forward starter
   • Star Delta starter power wiring & con...  

Automatic reverse forward motor starter connection
   • Automatic reverse forward starter con...  


Thanks for watching

posted by talonstrike9f